Senator ROBERTS: Thank you for appearing here today. I said in 2018 that this is a dog: no cost-benefit analysis, no transparent business case and no basis. From your January 2024 project update, it seems that Florence has started moving again, drilling the headrace tunnel at Tantangara. How much distance has been made since the machine became bogged?
Mr Barnes: As of this morning, 241 metres.
Senator ROBERTS: How many weeks is that?
Mr Barnes: That’s about eight weeks.
Senator ROBERTS: Let’s move on to the water. Once completed, how much water will the project require to operate, and what will the losses be to evaporation and seepage?
Mr Barnes: The Tantangara Dam reservoir will contain 350,000 gigawatt hours of water equivalent, which is around 700 gigalitres.
Senator ROBERTS: How many gigalitres?
Mr Barnes: Sorry, 240 gigalitres, two-thirds of that. The losses on moving the water uphill and bringing it downhill is in the order of 20 per cent.
Senator ROBERTS: And evaporation and seepage?
Mr Barnes: There’s no additional evaporation caused by the operation of Snowy 2.0.
Senator ROBERTS: I appreciate you can access Talbingo water, but I’m looking at issues around Tantangara, the top dam. Tantangara Dam has a poor catchment design, as I understand it, holds a nominal 250 gigalitres—you said 240—and is currently at 19 per cent capacity, so roughly 47 gigalitres. You must be watching the water closely, since water is essential to your project. Can you tell me the latest capacity and how much of that is that is dead storage?
Mr Barnes: Tantangara reservoir allows us to store 240 gigalitres. Obviously, before we were to operate Snowy 2.0, we would ensure that it was more full than 19 per cent, but there’s no lost storage in effect.
Senator ROBERTS: What is the effective storage that you’re counting on?
Mr Barnes: It’s 240 gigalitres, which turns into 350 gigawatt hours.
Senator ROBERTS: The long-term weather forecasts say it’ll be fairly wet until it starts becoming dry around 2032, when Snowy 2.0 starts. Tantangara, as I understand it, is used to store and release all of the environmental water going into the Murrumbidgee River. What happens if the 40 gigalitres available after dead water—unless there’s another figure in there; dead water being the amount of water that’s basically inaccessible because it’s below the outlet—are required for environmental flow? Who owns the water that you pump from Talbingo to Tantangara? Can you show me the water use agreement between your project, the federal government and the NSW government, please?
Mr Barnes: We don’t own the water; we operate under the terms of our water licence, which is a public document. Perhaps Mr Whitby can—
Mr Whitby: Senator, I think you’re not taking into account the natural inflows that occur into the upper Murrumbidgee, which, from memory and off the top of my head, is about a similar amount to that 240 gigalitres of storage.
Senator ROBERTS: It’s a fairly small catchment, though, as I understand it.
Mr Whitby: There’s still quite a bit of water that comes in there.
Senator ROBERTS: Quite a bit—how much?
Mr Whitby: I just said, off the top of my head, that it’s around 240 gigalitres of natural inflows.
Senator ROBERTS: So that’s in addition—
Mr Whitby: And, additionally, when Snowy 2.0 is operating, depending on the balance between pumping and generation, you can take water out of Talbingo, the lower storage, which is the whole point of the arrangement.
Senator ROBERTS: My understanding is that the Commonwealth Environmental Water Holder owns and controls every drop in that dam.
Mr Whitby: No.
Senator ROBERTS: The Snowy Water Inquiry Outcomes Implementation Deed, SWIOID—which was some years ago—is currently under review based on the upper Murrumbidgee River running dry recently. Will any outcome from that review lead to your water entitlement being reduced or affected in any way?
Mr Barnes: I think it’s too early to say that; it has some time to go.
Senator ROBERTS: That would be a significant risk to the whole project. Surely you’ve done some assessments of it.
Mr Barnes: I think the review will take into account and balance the needs of our stakeholders, including the national electricity market. There are times, of course, where—if we go back to the 2019 drought and bushfires—the flows through the upper Murrumbidgee were higher than naturally would have occurred, as a result of our operations. So it can have a positive effect.
Senator ROBERTS: According to an ABC article, Snowy Hydro has previously stated that the regulation governing water allocations for the scheme is independent of it and that the government owns the water; is that correct?
Mr Whitby: Yes.
Senator ROBERTS: So there’s no agreement at risk here—or anything subject to an agreement?
Mr Barnes: We operate under our water licence. The implementation deed you referred to from 2002 is the instrument that’s under review.
Senator ROBERTS: From 2002—that’s SWIOID.
Mr Barnes: Yes.
Senator ROBERTS: Three weeks ago, the New South Wales government announced temporary water restrictions on Murrumbidgee water licences, specifically water sources I and II, high-flow river licences. Are you confident you’ll always get your water? Everyone seems to be claiming the water—the farms, the towns, the environment—but who actually gets it in the water brawl?
Mr Barnes: I might leave that one to Mr Whitby, but we don’t consume any water.
Mr Whitby: I’m not sure I really understand the question, Senator. Are you asking if we’re confident that we will get future inflows?
Senator ROBERTS: Yes.
Mr Whitby: That’s a matter for the gods; I’ll leave it there.
Senator ROBERTS: So we’re leaving it to the gods.